From old to future

With the renewal of the transmission pipeline from the Feldkirchen Waterworks, Holding Graz is strengthening a key component of the city's drinking water supply. The approximately seven-kilometre infrastructure project combines maximum supply reliability with a consistent commitment to the circular economy: TRM supplies durable ductile iron pipe systems made from 100% recycled material while simultaneously returning the cast iron recovered from the dismantling of the historic pipeline to the production cycle.

More information?
>> Click here for the reference