In order to be able to transfer the loads safely into the subsoil, the piles had to be guided down to the bedrock. Due to the geologically difficult situation, with the top of the rock repeatedly rising and falling, the ductile TRM driven pile was able to establish itself as the foundation element. Due to the flexible adaptability of the pile lengths, this foundation variant proved to be the ideal solution, both economically and technically. Approximately 11,000 linear meters were placed underground in this way, thus securing a stable foundation for a measure that will provide an Upper Austrian producer with more storage space.
Fast. Simple. Safe.
www.trm.at