A customized solution with the TRM Pipe System

In the 1/2024 issue "30 years of IATT", our sales representative Luca Frasson reports on a project with unique challenges in which the trenchless installation method was used. The pipeline inevitably had to cross the railroad line in the immediate vicinity of a busy level crossing, which is mainly frequented by cars and heavy goods vehicles.

>> To the original Italian version