The city of Dornbirn is building a complete 3-storey new building of the classroom with a basement. The soil explorations showed a 3-unit layer sequence from bedding over sludge up to a gravel-sand-silt sequence. The founding proposal was auger pile or "ductile pile mantle pressed". The TRM ductile iron pile was able to u.a. enforce due to different pile heights and limited space.