Open-Air Pipes

Temporary replacement pipes

The construction of open-air pipes is one of the most technically challenging methods in pipe construction.

At first glance, the planning challenges might not seem too onerous. However, on closer inspection, some very complex and technically demanding details have to be taken into account. Open pipes are pipes that are laid not in the ground but above the surface – the pipe and soil system is interrupted, so to speak. Influences such as temperature changes in the medium or the environment take full effect here. Forces caused by internal pressure – which cannot be transmitted into the ground via the pipe bedding – have to be controlled in some way, and it is in this context that terms such as position securing, interim management and protection against vandalism are often mentioned. On closer inspection, a task that initially seems simple can become a technically complex challenge.

Why a VRS®-T restrained locking system?

  • Simple and quick assembly and disassembly
  • Increased security against vandalism
  • Operating pressures of up to 100 bar
  • Consistent material properties at any temperature
  • UV resistance
  • Interim pipes – multiple reuse of the pipe

Our service

  • On-site support
  • Holistic understanding
  • Assistance in planning

3,100 tons of CO2 savings

by feeding the waste heat into the district heating network

Over 70 years
Know-how

at the location Hall