Westgate Tunnel Project – Gantry & Tank Piles
Ductile iron piles were installed in restricted access locations at night under 8-9 m head room to support future gantry sign structures and as well as the foundations for a storm water tank during the day shift. TRM 170 mm/10.6 mm piles driven end bearing, between 20 m to 35 m in length.