A pipe network calculation of the company SETEC has shown that the main line in an area of the municipality Feldkirchen (10. Oktober Straße) is too small. In this calculation, all information on line sizing and routing was compiled taking into account the pressure and volume behavior in the entire supply network of Feldkirchen.
In order to ensure the security of supply of drinking and utility water for the city, as well as for the newly developed land in this area, an extension of the existing system was decided. Furthermore, the commissioning of new pumping stations for the hinterland of Feldkirchen was included in the project.