Through its know-how Tiroler Rohre GmbH (TRM) was also able to support the Pitztal Glacier ski area with pipes during the construction of a pumping line in the past two summers. The construction work was carried out by Strabag. 8000 meters of GJS pipes in nominal sizes from DN 80 to DN 250 and a pressure rating up to 85 bar were used. Since the highest point of the glacier is located at 3440 meters above sea level, could be built only in the months of June to October.