From the middle of 2015, Stubenbach GmbH will build a power plant in Stuben (amount of extraction water 420 l / s, 676 kW bottleneck capacity, 2.2 GWh standard working capacity).
The customer chose a 1,800 m long DN 500 cast iron pipe from TRM. It can also be quickly and safely installed in the upper section of the line in extremely steep and rocky terrain thanks to the unique VRS®-T connection.