In the summer of 2018, the Werfenweng mountain railways built a new snow-making system in the Austrian province of Salzburg. This should increase the snow reliability. To meet the requirements, a snowmaking storage with a capacity of 107,000 m³ volume was created. In order to transport the water to the 70 tapping points of the snowmaking equipment, pressure pipes of Tiroler Rohre GmbH in nominal sizes DN 150 to DN 400 were laid.