Bergbahnen Werfenweng built snow-making system

In the summer of 2018, the Werfenweng mountain railways built a new snow-making system in the Austrian province of Salzburg. This should increase the snow reliability. To meet the requirements, a snowmaking storage with a capacity of 107,000 m³ volume was created. In order to transport the water to the 70 tapping points of the snowmaking equipment, pressure pipes of Tiroler Rohre GmbH in nominal sizes DN 150 to DN 400 were laid.

A total of 6,500 m of ductile pipes and once as many running meters of air ducts were installed in this project. In order to control and supply the snowmaking systems, Werfenweng cable cars laid 60,000 m of power and control cables. After the successful completion of the construction work, the guests have access to the 10 ski lifts as well as perfectly snow-covered pistes.

Safe water supply.
www.trm.at

Our pipes,
built for generations