In order to meet the requirements of torrent and avalanche control in the Rettenbachtal next to the glacier road, a bed load basin will be built in summer 2020. The Ötztal mountain railways are laying a ski path with a snowmaking system. Due to the extreme environmental conditions, the mountain railways decide for ductile iron pipe systems from TRM. The new pipes with a diameter of DN 300 and a pressure level of 85 bar are being laid by the experienced employees of HTB. The simple VRS-T connection guarantees safe operation even under the most difficult conditions.
Safe water supply.
www.trm.at